stone0371
发表于 2012-8-12 22:06:13
The click rate N shall be determined with 18 working cycles per hour; each cycle shall comprise:
喀呖声率N 应以每小时18个工作周期确定;每一个周期应包括:
a) on hoists having only operating speed: lift; pause; lower; pause;
对只有一种运行速度的升降机:提升、暂停、降低、暂停;
b) on hoists having two operating speeds with both the following cycles, alternating:
对有两种运行速度的升降机,有下面两个互相交替的周期:
Cycle 1: fine lift (creep speed); lift (full speed); fine lift; pause; fine lower; lower (full speed); fine lower; pause;
周期1:慢提速(蠕变速度),提升(全速)、慢提升、暂停、慢降低、降低(全速)、慢降低、暂停;
Cycle 2: fine lift; pause; fine lower; pause.
周期2:慢提升、暂停、慢降低、暂停。
NOTE For shortening the time to be used for testing the cycles may be accelerated, but the click rate is calculated on the basis of 18 cycles per hour; care should be taken not to damage the motor by exceeding duty cycle.
注:为了缩短测试时间,周期可以加速,但是喀呖声率以每小时18个工作周期为基准;应注意增大工作周期不应损坏电动机。
For any traction drive a similar test shall be made.
其他任何牵引装置应进行类似测试。
Lifting and traction shall be measured and evaluated separately.
提升和牵引应分开测量和评定。
stone0371
发表于 2012-8-12 22:07:40
7.4 Interpretation of results测试结果说明
桃花岛主
发表于 2012-8-12 22:45:35
楼主辛苦了,付出有目共睹,深表感谢!
有一周多没顾得上学习了,明天开始继续向楼主取经。
stone0371
发表于 2012-8-13 09:28:35
回复 173# 桃花岛主
谢谢岛主和大家的支持,你们的支持是我坚持下去的动力。谢谢。
桃花岛主
发表于 2012-8-13 20:36:15
回复 4# stone0371
带卷线盘的这种情况电源线岂不是很长,影响是不是很大吗,这时电源线如何处理,GB9254是扎成束,这个应该不可以。
stone0371
发表于 2012-8-13 20:38:40
回复 175# 桃花岛主
在测试CE的时候,是要把电源线全部拉出来,折成30cm-40cm的平行线束的。这和超过0.8m的电源线的处理方式是一样的。
桃花岛主
发表于 2012-8-13 20:45:54
回复 6# stone0371
“骚扰功率(电源端子之外的测量)用吸收钳进行测量”这句话是不是说电源线不能用功率吸收钳测试辐射,只有电源线之外的其它线可以。
桃花岛主
发表于 2012-8-13 20:59:47
回复 48# stone0371
这个首先有两种工作模式,如空调,有的就有制冷和制热模式,两种模式时内部模块可能不一样,所以要强调制冷和制热模式下得温度限值,而且我觉得这个温度限值和实际情况和符合,如制冷,30度左右,一般室温30度就要开空调了;制冷也一样吧。
这两种温度状态实际测试中可能都不能符合,所以允许在稳定运行的常温下测试。
桃花岛主
发表于 2012-8-13 21:04:05
回复 49# stone0371
人工电源网络好像有V型和H型还是什么的,记不清楚了,这两啥区别?各是什么应用场合。
stone0371
发表于 2012-8-13 21:44:20
回复 177# 桃花岛主
这个不是这样理解的,电源端子的测量这里是指传导的测量。在讲传导的时候,传导的说法是 terminal voltage on mains terminals。